2G İnşaat Enerji

YELLICE WIND POWER PLANT 154 kV POWER TRANSMISSION LINE (PTL)

YELLICE WIND POWER PLANT 154 kV POWER TRANSMISSION LINE (PTL)

Employer: YEO Technology Energy Industry Inc.
Project Location: Sivas
Subject: Construction of Yellice Wind Power Plant 154 kV Power Transmission Line (PTL)
Start Date:
11/26/2025

Project Description:

This project, carried out by 2G Energy Construction, involves the construction of a 154 kV power transmission line to integrate the Yellice Wind Power Plant (WPP), currently under construction in Sivas, into the national energy transmission system.

The project includes:
• Power transmission line infrastructure works
• Pole assembly and line installation works
• Power transmission line assembly • Site organization and technical applications

The project is being carried out by 2G Energy Construction in accordance with engineering and site application standards.